QUBE Development has officially launched SAWA Residences, a waterfront apartment building in Meydan Horizon, Mohammed Bin Rashid City (MBR City). The project has 355 one-, two- and three-bedroom homes, with one-bedroom apartments from AED 1.05 million on a 60/40 payment plan and handover planned for Q1 2030. QUBE announced the launch on 3 November 2026.
The selling point is the water. SAWA sits on one of the longest lagoon frontages in Meydan Horizon, with direct access to about 2 km of crystal lagoons and a 4 km landscaped promenade.

Credit: QUBE Development
SAWA Residences: Key Facts
| Developer | QUBE Development (CEO Egor Molchanov) |
|---|---|
| Location | Meydan Horizon, Mohammed Bin Rashid City, Dubai |
| Homes | 355 apartments: one, two and three bedrooms |
| Layouts | 8 one-bedroom types, 5 two-bedroom types, 2 three-bedroom types |
| Payment plan | 60/40 |
| Handover | Q1 2030 |
| Fit-out | Bosch kitchen appliances, Synchro smart lighting |
| Launch | 3 November 2026 |
Prices and Sizes
| Unit type | Starting size | Starting price |
|---|---|---|
| One bedroom | 390 sq ft | AED 1.05 million |
| Two bedrooms | 1,013 sq ft | AED 2.41 million |
| Three bedrooms | 1,254 sq ft | AED 3.08 million |
Prices and sizes are QUBE's published starting figures on the official SAWA Residences page, as of 3 November 2026. They can change as units sell.

Credit: QUBE Development
A Lower-Density Waterfront Address
QUBE has placed SAWA in a lower-density part of Meydan Horizon, so the building gets more daylight, open views and a direct link to the waterfront rather than a distant water view. The design follows QUBE's "Meant to Be" approach: clean contemporary lines, tropical planting and a building that works with the land around it.
"Exceptional architecture can be created anywhere, but prime waterfront land cannot be replicated," said Egor Molchanov, CEO of QUBE Development. "SAWA Residences is our response to the opportunity presented by Meydan Horizon, combining direct lagoon access, strong connectivity and a prime position within one of MBR City's emerging waterfront districts."
Every apartment comes with integrated Bosch kitchen appliances and smart-home lighting, so buyers do not have to budget for those upgrades later.

Credit: QUBE Development
Amenities
- Wellness: main swimming pool, relaxation pool, solarium, private cabanas, steam and sauna, and a Zen garden with a water feature
- Fitness: gym with Technogym equipment, boxing corner, indoor yoga studio and outdoor yoga zone
- Social: residents' lounge, pool bar, meeting rooms and a barbecue area
- Family: kids' pool, indoor playroom and outdoor play area
- Entertainment: cinema room with a virtual reality corner

Credit: QUBE Development
Location and Drive Times
Meydan Horizon is the newer waterfront district of MBR City, built around lagoons, open green space and a promenade. Road links via Ras Al Khor Road and the Dubai–Al Ain Road put central Dubai close by.
| Destination | Approximate drive |
|---|---|
| Meydan Racecourse | 8 minutes |
| Ras Al Khor Wildlife Sanctuary | 8 minutes |
| Business Bay | 10 minutes |
| Dubai International Airport | 12 minutes |
| Burj Khalifa and The Dubai Mall | 15 minutes |
| DIFC | 15 minutes |
Indicative drive times published by QUBE, subject to route and traffic.
Meydan Horizon Market Data
| Measure (apartments, last 12 months) | Meydan Horizon |
|---|---|
| Median price per sq ft | AED 2,230 (up 8.9%) |
| Transactions | 479 (down 42.4%) |
| Capital appreciation | 0% |
| QUBE Development handover record (DLD) | Result |
|---|---|
| Projects completed on time | 1 |
| Projects completed late | 0 |
| Projects currently overdue | 0 |
| On-time delivery rate | 100% |
Source: DXBinteract (Dubai Land Department transaction data), as of November 2026.

Credit: QUBE Development
What It Means for Buyers and Investors
An entry point to waterfront MBR City. With one-bedroom homes from AED 1.05 million, SAWA is one of the more accessible ways into lagoon-front living close to Downtown and Business Bay. Compare the per-square-foot price of the unit you choose against the area's AED 2,230 median before you commit.
Track record is short but clean. DLD records show QUBE has delivered one project, on time, with nothing overdue. That is a good sign, but it is a small sample, so check the escrow account and construction progress as the project moves forward.
Watch the supply. Meydan Horizon and MBR City have many projects under way, and the DLD data shows apartment transactions in the area down 42% over the past year while prices rose. Choose layouts and floors with lasting appeal, such as direct lagoon views.
Talk to Luxwell Real Estate
Interested in SAWA Residences or other waterfront launches in MBR City? Luxwell Real Estate is a boutique luxury brokerage in Business Bay. We can shortlist ready and off-plan options, share recent sales data and help you ask the right questions before you commit.
- Email: info@luxwellrealestate.com
- Website: www.luxwellrealestate.com
- Contact form: Contact Luxwell
Sources: QUBE Development, official SAWA Residences page (qbd.ae, 3 November 2026); QUBE launch announcement as reported by Construction Business News Middle East and Gulf Construction Online (3 November 2026); DXBinteract.
Related reading
Frequently Asked Questions
What is SAWA Residences?
- SAWA Residences is a waterfront apartment project by QUBE Development in Meydan Horizon, Mohammed Bin Rashid City, Dubai. It has 355 one-, two- and three-bedroom homes with direct access to the lagoon and waterfront promenade.
How much are apartments at SAWA Residences?
- QUBE's official starting prices are AED 1.05 million for a one-bedroom (from 390 sq ft), AED 2.41 million for a two-bedroom (from 1,013 sq ft) and AED 3.08 million for a three-bedroom (from 1,254 sq ft), as of 3 November 2026.
What is the payment plan?
- QUBE lists a 60/40 payment plan for SAWA Residences. Ask for the full schedule at booking, as terms can change.
When is handover?
- QUBE has published a planned handover of Q1 2030.
What amenities does SAWA Residences have?
- A main pool, relaxation pool and kids' pool, Zen garden, steam and sauna, a Technogym-equipped gym with boxing corner, indoor and outdoor yoga areas, residents' lounge, pool bar, meeting rooms, barbecue area, children's play areas and a cinema room with a VR corner.
Is QUBE Development a reliable developer?
- According to DXBinteract's Dubai Land Department data, QUBE has completed one project, delivered on time, with no late or overdue projects, as of November 2026. It is a short record, so check escrow and construction progress as well.
Request details
Leave your details to download the details